E-COATING - Concrete ThermalShield

ReHarmony E-COATING - Concrete ThermalShield offers excellent stain resistance, weather resistance, and anti-mold and anti-algae performance, making it safe, durable, and eco-friendly.

Its main components include lightfast lead-free pigments, mineral fillers, pure acrylic polymers, water, and additives, with no lead or mercury added. It is an ideal choice for sustainable and long-lasting surface protection.

  • Color: White

  • Composition: Polymer emulsion, pigments/fillers, additives, water

  • Application Methods: Brush, roller, or spray

  • Coverage: 5–6 m²/L (two coats)

  • Dilution: ≤15% water addition

  • Dry Film Thickness: 75–150 μm

  • Drying Time (25°C, 50% RH): 12–24 hours

  • Recoat Time (25°C, 50% RH): 4–8 hours

  • Solid Content: 40–60%

  • Shelf Life: 12–18 months

  • Recommended System: Primer

    Actual consumption and coverage may vary depending on application method, surface porosity/roughness, and environmental conditions.

Product Specifications

Bright living room with modern inventory
Bright living room with modern inventory

Long-Lasting Cooling Performance

Exceptional Stain Resistance

Feature

Superior Weather and Biological Resistance

Environmentally Friendly and Health-Conscious

Surface Preparation Technical Requirements

Substrate Cleaning

  • Remove all surface contaminants (dust, oil, release agents) using brooms, scrapers, or sandpaper. Degrease oily areas with specialized cleaners.

  • Fill holes and cracks with putty, then sand smooth after drying. For larger cracks:

    1. First cut into V-grooves

    2. Then fill with putty or sealant

Surface Leveling

  • Check flatness with a straightedge (max. 3-5mm deviation allowed).

  • Sand down protrusions; refill recessed areas with putty as needed.

Moisture Requirements

  • Maximum moisture content: 10% (test with moisture meter).

  • New plaster walls must cure for 10-15 days before painting.

pH Requirements

  • Maintain pH between 7-9 (neutral to slightly alkaline).

  • For high pH: Neutralize with oxalic acid solution → rinse with water → dry thoroughly.

Adhesion Enhancement

  • Apply a sealing primer after surface preparation to:

    1. Improve paint adhesion

    2. Prevent moisture/alkali migration from substrate